Our works
LOGAN WATER VALVE AND HYDRANT RENEWAL PROGRAM
VARIOUS SITES, LOGAN CITY, QLD | LOGAN WATER Alliance
JANUARY 2024 - ONGOING (THROUGH 2027)
Contract Value $25M+
Allstar Infrastructure was engaged by Logan Water to deliver a large-scale valve and hydrant renewal program across the Logan City water distribution network. The program focuses on replacing ageing and defective assets to improve network reliability, operational resilience, and the long-term performance of critical water infrastructure.
Since commencing in January 2024, the program has evolved into a collaborative partnership between Logan Water and Allstar Infrastructure, with a shared commitment to safety, quality, innovation, and efficient service delivery. By 2026, the team had successfully renewed more than 1,000 valves and hydrants, with the program continuing into 2027.

OUR SCOPE
-
Replace 1,000+ Aged or Defective Assets
Remove and replace ageing or faulty valves and fire hydrants across the Logan Water network to improve asset condition, maintain compliance, and ensure reliable network operation. -
Improve Service Reliability and Resilience
Strengthen the performance of the water distribution network by reducing asset failures, minimising unplanned outages, and improving network isolation capabilities. -
Operate Within Live Water Networks
Plan and deliver works within operational water infrastructure, including shutdown coordination, stakeholder communication, testing, and recommissioning. -
Traffic and Community Management
Implement traffic management and pedestrian control measures while minimising disruption to residents, businesses, schools, and road users. -
Full Civil Construction and Reinstatement
Undertake excavation, service location, installation, testing, commissioning, and reinstatement of pavements, footpaths, landscaping, and associated infrastructure.
CHALLENGES / HIGHLIGHTS
-
Long-Term Collaborative Partnership
Since commencing the program in January 2024, Allstar Infrastructure has worked closely with Logan Water as a trusted delivery partner, developing a strong and collaborative working relationship focused on achieving program outcomes. -
Network Shutdowns & Service Management
Careful planning and coordination of water network isolations have enabled valve and hydrant replacements to be completed safely while minimising disruptions to customers and maintaining water services. -
Successful Large-Scale Asset Renewal
More than 1,000 valves and hydrants have been renewed across the Logan Water network, significantly improving network reliability, operational flexibility, and asset performance. -
Efficient Program Delivery
Structured planning, work batching, resource coordination, and stakeholder engagement have enabled consistent achievement of delivery targets across numerous sites throughout Logan City. -
Self-Performed Delivery Excellence
Works are delivered using Allstar Infrastructure's experienced personnel, plant, and equipment, providing Logan Water with a responsive and efficient delivery model.
KEY ACHIEVEMENTS
-
Successfully renewed more than 1,000 valves and hydrants across the Logan Water network
-
Established a strong collaborative partnership with Logan Water built on trust, performance, and continuous improvement
-
Maintained high standards of safety, quality, and environmental compliance throughout delivery
-
Minimized customer interruptions through detailed shutdown planning and stakeholder engagement
-
Program extended through 2027, reflecting successful delivery and ongoing client confidence
Through this ongoing program, Allstar Infrastructure continues to support Logan Water in maintaining a safe, reliable, and resilient water network, ensuring critical infrastructure can meet the needs of Logan City's rapidly growing community.


